Bam Construction; Kings Cross Central, Eastern Goods Yard & University of Arts

This large project was taken on by Quicksand Flooring in March 2011 and was an unusual project for everyone involved. The wood blocks are end grain and were laid individually one by one leaving a small gap between each block to allow for expansion. In total, a million and a half blocks were laid over an area of nearly three thousand square meters. Then it was Quicksand Flooring’s job to sand all of the areas and apply a two-part oil which gives the floor an added durability. Needless to say, we carried out the entire job with the up most professionalism and the client was impressed with the way we worked and also how we worked with them. We carry out all maintenance on the floors re-applying a freshen up product every 6-9 months depending on the wear of surface.